Saturday, January 2, 2021

2. January 2021 HO Column Mountain Spur, Tunnel and Cutting construction completed

Column Mountain is now complete.

The mountain dramatically reduces the visual impact of the shed support post on the layout, it is now one of 2 focal points depending on which way the layout approached (from inside the shed of through the roller door).

Front View

Right Hand Side view

Left Hand Side view


Looking down the Cutting

Cutting with train

Back to Construction Logs

No comments: